Download Files     |      Catch us on:   

YOUR PREMIER DESTINATION FOR UNDERGROUND SERVICES

Apex - 8" Steel / 12" HDPE Creek Crossing - Greensburg, PA - Fall 2017

Apex Via DDS
Project Description: 

JMF successfully completed a pair of bores under a local protected creek. The allotted ROW allowed only a 10 foot separation between the 8" steel gas main and the 12" HDPE water line. Due to the sensitive nature of the surrounding areas, JMF kept drill fluid usage to a minimum to prevent any chance of frackout.